LEBL Jetways
Posted: Sun Apr 26, 2020 10:48 pm
Hi all,
I have completed the SODE work after installing LEBL. The jetway practically floating since the bridge is missing. What can i do to negate this issue. Thanks
I have completed the SODE work after installing LEBL. The jetway practically floating since the bridge is missing. What can i do to negate this issue. Thanks